Process Management

A process record is a governed description of how work is done. Like a controlled document it has owners, a revision chain, an approval lifecycle and a record-level authority matrix β€” but instead of a file, its content is structured: steps, responsibilities, risks, opportunities, stakeholders and expectations.

Process records and controlled documents solve different halves of the same problem. A document says what the procedure text is; a process record says who does what, in what order, with which risks attached.

Core fields​

  • Code β€” auto-generated. Kept the same across the whole revision chain.
  • Name β€” the process title.
  • Process step type β€” classifies the process. Must be a step type whose category is Process. See Process Step Types.
  • Parent process β€” optional, building the process hierarchy.
  • Owner β€” the accountable identity.
  • Purpose β€” why this process exists.
  • Scope β€” what it covers and what it does not.
  • Critical success factors β€” what has to go right.
  • Cost / duration β€” the planning figures.
  • Revision number / version number β€” see below.
  • Review scheduling β€” when the process is due for re-examination.

Process-local content​

Seven collections describe the process itself. None of them drives a task or a lifecycle action β€” they are descriptive and planning data:

CollectionContents
StepsThe ordered list of steps, each optionally with an executor.
ResponsiblesRACI parties β€” responsible, accountable, consulted, informed β€” optionally scoped to a specific step.
RisksRisks attached to the process or to a step. Each carries impact, probability and score.
OpportunitiesThe same shape as risks, for improvement opportunities.
Stakeholder expectationsWhat stakeholders expect, with impact/probability/score.
StakeholdersWho the stakeholders are.
AttachmentsSupporting files.
note

Impact, probability and score on risks, opportunities and expectations are three independent fields. The score is not calculated as impact Γ— probability β€” it is entered directly, because that formula could not be substantiated as a universal rule.

Steps and executors​

A step is a junction between the process and a process step type, with a display order and at most one executor.

The referenced step type must have its category set to ProcessStep and must not be flagged as "cannot be linked to a process". These are enforced when you save, not just hidden in the picker.

Revisions​

A published process is revised rather than edited:

  • Start revision opens a new row in the same chain β€” same code, revision number incremented, all twelve collections deep-copied.
  • The source row is untouched and stays published until the revision is approved.
  • Approving the revision supersedes the previous published row, which moves to inactive.
  • Only one draft may be open in a chain at a time.

Copy detail is a different operation: it produces a brand-new, independent process with its own new code β€” not a revision.

Checkout locking​

A process can be locked while somebody works on it, preventing concurrent edits. The record shows who holds the lock and when it was taken.

The authority matrix​

Beyond the routing matrices, a process carries a record-level authority matrix that governs who may act on this specific record. This is separate from the routing matrices, which decide who gets tasks β€” the authority matrix decides who is allowed at all.

Deleting​

Deletion is allowed only while the process is in the draft category. A published or inactive process cannot be deleted; supersede or deactivate it instead.