Scoring List Definitions
The four scoring lists β probability, frequency, severity and risk value β are what scoring resolves against. They are four separate screens, each maintained on its own.
The three dimension lists supply the numbers a formula multiplies. The risk value list supplies the bands a formula result lands in. They look alike and behave differently, which is why they are four screens rather than one with a type column.
The three dimension listsβ
Probability, frequency and severity share one shape:
- Code β issued from that list's own number template when left empty.
- Name β the level as a person reads it:
Very low,Low,Medium,High,Very high. - Value β the weight the formula reads. This is the field that matters.
- Description β what the level means in practice. Worth filling in; it is what stops two assessors scoring the same situation two levels apart.
- Active β inactive levels are no longer offered when scoring.
Each list sorts by value, and no two levels within one list may carry the same value. A 3 in severity
and a 3 in probability are entirely unrelated and do not collide.
Write the descriptions as observable tests rather than adjectives. "Once a month" is a description somebody can apply; "fairly frequent" is one they will interpret differently every time.
The risk value listβ
The risk value list is the set of bands β the levels a scored risk is finally reported as. Its rows carry different fields:
- Code / Name β
Low,Medium,High,Critical, and whatever else your scale needs. - Band number β the number the risk level formula has to return in order to land on this band.
- Colour β how the band is drawn on the scoring result label, in the register and on the record view.
- Description β conventionally the score range this band covers.
- Active β inactive bands are not offered for manual selection.
The band number is the joinβ
The risk level formula returns a number. The band that applies is the one whose band number equals it. Nothing else connects them β not the code, not the name, not the order.
Two consequences:
- No two bands may declare the same band number. The second is refused, because a formula result matching two bands would have no answer.
- Every number the active formula can return needs a band. If the formula can return
4and no band declares4, scoring a risk that lands there fails with a message rather than saving without a level.
Reviewing this after changing a level formula is the one check worth doing by hand. Nothing warns you that a formula's range and a band list have drifted apart β the symptom is a scoring attempt that fails, or a band nobody ever reaches.
Colour is not decorationβ
Each band's colour is used consistently on the scoring result label, in the risk register and on the record view. It is how a supervisor scanning two hundred rows finds the ten that matter, so the ramp should be monotonic β a green-to-red progression with no colour reused.
The default set ships as five bands numbered 1 to 5 with a green-to-red ramp, and every colour is editable.
Four lists, four sets of permissionsβ
Each of the four screens is permissioned separately. Being allowed to edit severity does not imply being allowed to edit the band definitions, and that separation is deliberate: the bands decide what the whole register reports, while a dimension level decides what one number means.
Excel import and exportβ
Each of the four lists has its own import template, named after the list and carrying only the columns that list uses. A row that names a different list is refused, and the rest of the file still loads.
Leave the code column blank and the code is issued from that list's own number template β which is also what keeps the four lists' counters and prefixes apart.
Adding a level to a live scaleβ
Adding a sixth level to a dimension is safe: existing records keep the level they named, and the new one is offered from then on.
Changing an existing level's value is not. Scores already stored are not recalculated β deliberately, so that rewriting a scale does not silently move assessments that were reviewed and approved on the old one. The consequence is two populations of records scored on different rules.
If you need a scale change to apply to existing risks, the mechanism is a revision per risk β a new round, scored on the new scale, with the old round preserved as the record of what was decided before.